BUILDING FUTURISTIC INDIA

Expertise

IRRIGATION

Sowing the seeds of future

The lifeline of farmers and the basic requirement to feed the vast population, irrigation infrastructure includes a network of major, medium and minor canals from rivers, ground water, well-based systems, tanks, and other rainwater harvesting projects for agricultural activities. Other activities that are predominantly dependent on the availability of water resources are forestry, animal husbandry, horticulture and sericulture. NCC plays a crucial role in improving food security, reducing dependence on monsoons, improving agricultural & allied industrial productivity and creating jobs in the rural areas through its wide expertise and resources in irrigation infrastructure development projects.

sowing the seeds of future
dams & reservoirs

Dams & reservoirs

tunnels

Tunnels

barrages

Barrages

spillways & aqueducts

Spillways & aqueducts

hydroelectric power projects

Hydroelectric power projects

Key Projects

key-projects
key-projects
key-projects
key-projects
  • Construction of branch canal and its lining including CM & CD works from km 82.300 to km. 112.500 under Kutchh Branch Canal, Kutchh District, Gujarat
  • Restoration of Eastern Gandak canal system including Gandak barrage and its appurtenant under Rastriya Sam Vikash Yojana, Bihar
  • Earthwork excavation, forming embankment and construction of CM & CD works of right main canal from km. 52.450 to km 107.000 & its distributary system and field channels to Thotapalli Barrage Project, Vizianagaram District, Andhra Pradesh
  • Formation of right earth bund and closing of gorge portion by earthen bund, excavation of left and right canals, construction of right head sluice of Gundlakamma Reservoir Project including CM & CD works and distributary system for an ayacut of80,060 acres, Ongole District, Andhra Pradesh
  • Construction of Saradih barrage with vertical lift gates and other appurtenant works across Mahanadi River, Janjgir-Champa District, Chhattishgarh
  • Widening of SRBC main canal from km 25.067 to km 56.775 & construction of additional structures, improvements & alterations to CM & CD works including all other allied works under GNSS Package no. 26 of SRBC, Nandyal district, Andhra Pradesh
  • Investigation, designs and formation of Mallemadugu reservoir and earth work Excavation of Kailasagiri canal from km 0.00 to 65.50 including construction of CM & CD works and distributary system including field channels to feed an ayacut of 55,000 acres in Chittoor and Nellore Districts under GNSS package Bo. 10/06, Chitoor District, Andhra Pradesh
  • EPC Execution of Daudhan Dam under Ken-Betwa Link Project”, Madhya Pradesh – (Planning, Design and Engineering /Civil Works/Supply of Hydro Mechanical Plant & Machinery /Transportation, Storage, Erection, Testing and Commissioning of Hydro Mechanical Plant & Machinery and subsequent Operation and Maintenance) is in progress.
  • Detailed Survey & Investigation, Planning & Design, Supplying all materials, labours, equipment & machineries, Construction, execution & Installation, Testing, Commissioning along with successful Trial run period of 3 months and Comprehensive Operation and Maintenance for 60 months after Successful Trial Run of Providing Drinking Water to Aurangabad, Sasaram and Dehri Town, Bihar under Jal-Jeevan-Hariyali Abhiyan on Turn-key basis by utilizing surface water of Sone River is in progress.
  • HNSS Phase II – “Widening of Punganur Branch Canal (PBC), Andhra Pradesh from KM.79.600 to Km.220.350 for enhancing the carrying capacity including construction of CM & CD works to meet the irrigation, drinking water needs is in advanced stage of completion.
  • Polavaram Irrigation Project Left Main Canal, Andhra Pradesh - Balance essential works of Package 1 i.e., Conducting detailed investigation preparation of Hydraulic Particulars, Designs and Engineering, Preparation of Estimates and Excavation of Main Canal formation of banks including canal lining and construction of CM&CD works from KM 0.000 to KM 25.600 is in progress.
  • Polavaram Irrigation Project Left Main Canal, Andhra Pradesh – Balance essential works of Package 3 i.e., conducting Detailed Investigation preparation of Hydraulic particulars, designs and engineering, preparation of estimates and excavation of Main Canal Formation of banks including Canal Lining and Construction of CM&CD works from KM 51.600 to KM69.145 + 1009M is in progress.
  • Excavation and Formation of Gravity Main Canal from 827.7RD to 909.4RD including Construction of CM & CD works Outlets and Lining of Tirhut Main Canal, Ghandak Phase-II, Bihar.
  • Ensuring availability of water round the year near Vishnupad Mandir on Left Bank of Falgu River in Gaya District, Bihar.
  • PRLIS (Package No.9) under M/s.NCC-HES(JV) – Formation of Venkatadri Reservoir bund from KM 0.00 to KM 6.900 at Vattem(V), Bijinepally (M), Mahabubnagar Dirstrict, Telangana. The capacity of the Reservoir is 16.74 TMC and Maximum Height of Bund is 47.73m.
  • PRILS (Package No.11) under M/s.HES-PCIL-NCC(JV)– Formation of Venkatadri Reservoir bund from KM 11.550 to KM 16.300 at Vattem(V), Bijinepally(M), Mahabubnagar District, Telangana.
  • GNSS-Works under M/s. Maytas-NCC(JV) - Chitravathi balance reservoir right canal (Lingala Canal) from KM.0.000 to KM 63.000 and its distributories including construction of CM & CD works etc. complete to irrigate an ayacut of 25,000/- acres (Approx) including construction of Link Canal to PBC Cross Regulator, Head Regulator and Lift Irrigation System, Supply & Fabrication of Hydro Mechanical components and erection of vertical gates, stop log gates and its accessories of Lingala Irrigation scheme in Cuddapah District, Andhra Pradesh.
  • GNSS-Works- under M/s. Maytas -NCC (JV) - Construction of Gandikota Dam across Penna River and earth work excavation of GNSS Main canal including construction of CM & CD Works from KM 0.000 to KM 24.330 and construction of Head Regulator and formation of approach canal to Head Regulator and Formation of approach road to Gandikota dam site near Mangapatnam village, Cuddapah District, Andhra Pradesh.
  • Package No.29/2006 – under M/s.Maytas-NCC(JV) – Investigation, Design and Excavation of GNSS Flood Flow Canal (Gorakallu Reservoir to Owk Reservoir) for the reach from KM 46.000 to KM 57.700 including construction of CM&CD Works enroute in Kurnool District, Andhra Pradesh.
  • Formation of balancing reservoir of 1.514 TMC Ramatheertham Village, Chimakurthy Mandal, Prakasma District Ongloe Branch Canal in between M.16/5+330 to M.19/3+110, Andhra Pradesh.
  • Investigation, design, excavation and lining of Owk tunnel - II for feeding to Owk Reservoir from km 57.700 of GNSS flood flow canal including construction of adit underGNSS Package No. 30/06, Nandyal District, Andhra Pradesh.
  • Excavation of gravity canal including forming embankment, construction of sluices for the reach from km 15.000 to km 28.50 under Dr. B.R. Ambedkar Pranahitha Chevella Sujala Sravanthi Package No. 02, Adilabad District (Erstwhile Andhra Pradesh)
  • Main canal, including Lining and Construction of CM & CD works from km 51.600 to km 69.145 of LMC of Indira Sagar Project (Polavaram Project) - Package - 3, East Godavari District, Andhra Pradesh
  • Excavation of Gravity Canal including formation of Embankments, construction of sluices, CM & CD works, lining of main canal, distributary system duly lining and excavation of field channels and its structures for an extent of 20,500 acres ayacut (From km 0.000 to km71.500 of main canal) etc., complete for the reach from km 28.500 to km 71.500 which is taking off from the right flank of the proposed Barrage across River Pranahitha under Package-04, Adilabad District (Erstwhile Andhra Pradesh)
  • Design & execution of Stage-I & Stage-II pumping stations of Bheema Lift Irrigation Project (Lift -II), Mahabubnagar District (Erstwhile Andhra Pradesh)

  • Package II: Formation of Western Earthen Bund, Construction of Spillway in Western Earthen Bund and Excavation of surplus course channel.

  • Kaleshwaram Project under M/s.PLR-NCC-NEC(JV) – Formation of Baswapur Reservoir with a capacity of 11.39 TMC and High Level Canal with an ayacut of 2300 Ac near Baswapur (V), Bhongir(M), Yadadri- Bhongiri District, Telanagana.
  • Raising, Strengthening and Construction of Bituminous Road (including Reconstruction/ Restoration of Structures) on Eastern Kosi Embankment from 0.00 to 123.772KM, Eastern Kosi Main Canal (Right Bank) from 0.70 to 1.13KM of Bihar State under M/s.NCCL-Vashista JV.