BUILDING FUTURISTIC INDIA

Expertise

IRRIGATION

Sowing the seeds of future

The lifeline of farmers and the basic requirement to feed the vast population, irrigation infrastructure includes a network of major, medium and minor canals from rivers, ground water, well-based systems, tanks, and other rainwater harvesting projects for agricultural activities. Other activities that are predominantly dependent on the availability of water resources are forestry, animal husbandry, horticulture and sericulture. NCC plays a crucial role in improving food security, reducing dependence on monsoons, improving agricultural & allied industrial productivity and creating jobs in the rural areas through its wide expertise and resources in irrigation infrastructure development projects.

sowing the seeds of future
dams & reservoirs

Dams & reservoirs

tunnels

Tunnels

barrages

Barrages

spillways & aqueducts

Spillways & aqueducts

hydroelectric power projects

Hydroelectric power projects

Key Projects

key-projects
key-projects
key-projects
key-projects
  • Construction of branch canal and its lining including CM & CD works from km 82.300 to km. 112.500 under Kutchh Branch Canal, Kutchh District, Gujarat
  • Restoration of Eastern Gandak canal system including Gandak barrage and its appurtenant under Rastriya Sam Vikash Yojana, Bihar
  • Earthwork excavation, forming embankment and construction of CM & CD works of right main canal from km. 52.450 to km 107.000 & its distributary system and field channels to Thotapalli Barrage Project, Vizianagaram District, Andhra Pradesh
  • Formation of right earth bund and closing of gorge portion by earthen bund, excavation of left and right canals, construction of right head sluice of Gundlakamma Reservoir Project including CM & CD works and distributary system for an ayacut of80,060 acres, Ongole District, Andhra Pradesh
  • Construction of Saradih barrage with vertical lift gates and other appurtenant works across Mahanadi River, Janjgir-Champa District, Chhattishgarh
  • Widening of SRBC main canal from km 25.067 to km 56.775 & construction of additional structures, improvements & alterations to CM & CD works including all other allied works under GNSS Package no. 26 of SRBC, Nandyal district, Andhra Pradesh
  • Investigation, designs and formation of Mallemadugu reservoir and earth work Excavation of Kailasagiri canal from km 0.00 to 65.50 including construction of CM & CD works and distributary system including field channels to feed an ayacut of 55,000 acres in Chittoor and Nellore Districts under GNSS package Bo. 10/06, Chitoor District, Andhra Pradesh
  • Investigation, design, excavation and lining of Owk tunnel - II for feeding to Owk Reservoir from km 57.700 of GNSS flood flow canal including construction of adit underGNSS Package No. 30/06, Nandyal District, Andhra Pradesh.
  • Excavation of gravity canal including forming embankment, construction of sluices for the reach from km 15.000 to km 28.50 under Dr. B.R. Ambedkar Pranahitha Chevella Sujala Sravanthi Package No. 02, Adilabad District (Erstwhile Andhra Pradesh)
  • Main canal, including Lining and Construction of CM & CD works from km 51.600 to km 69.145 of LMC of Indira Sagar Project (Polavaram Project) - Package - 3, East Godavari District, Andhra Pradesh
  • Excavation of Gravity Canal including formation of Embankments, construction of sluices, CM & CD works, lining of main canal, distributary system duly lining and excavation of field channels and its structures for an extent of 20,500 acres ayacut (From km 0.000 to km71.500 of main canal) etc., complete for the reach from km 28.500 to km 71.500 which is taking off from the right flank of the proposed Barrage across River Pranahitha under Package-04, Adilabad District (Erstwhile Andhra Pradesh)
  • Design & execution of Stage-I & Stage-II pumping stations of Bheema Lift Irrigation Project (Lift -II), Mahabubnagar District (Erstwhile Andhra Pradesh)